See your site
without leaving
your office.
Our survey team captures your site with 360° cameras and maps every photo onto your BIM model — so you get remote visibility and visual progress documentation, updated after every site walk.

The Platform
See ArqTwin in action
One live dashboard for the whole project — progress, alerts, and every site update, without leaving the office.
How it works
Three steps to full remote visibility
You focus on the project. We handle the capture and data pipeline.
We capture your site
Our survey team arrives with 360° cameras and photos. We document every zone, level, and element — organised by date.
We map it onto your BIM model
Supply Revit or IFC — we handle conversion. Every capture is pinned to the exact element and viewpoint in the 3D model.
You track progress & share reports
Mark elements completed, generate bilingual EN/AR PDF reports, and share over WhatsApp — from anywhere.
Features
Everything you need to track a live site remotely
Purpose-built for Egyptian construction teams — not adapted from generic SaaS.
360° Site Walkthroughs
Panoramas pinned on the floor plan. Explore your site like Street View — level by level, zone by zone.
360° ↔ BIM Sync
Side-by-side: site reality vs. BIM design from the exact same viewpoint. Spot every deviation instantly.
Capture Time-Travel
Step back and forward through site walks by date. See exactly how progress evolved week by week.
Progress Tracking
Colour elements by status on the 3D model. Bulk-update entire levels or zones in seconds.
Live Dashboard
Completion percentages computed live from element statuses. Always in sync — no manual entry.
Bilingual EN/AR Reports
One-click PDF progress reports in English and Arabic. Share on WhatsApp or email — no formatting needed.
ERP & Custom Modules
Need BOQ tracking, payment certificates, or procurement? We build custom construction ERP modules to your workflow.
Full Customisation
Custom report templates, bespoke workflows, white-labelling — ArqTwin adapts to how your team works.
Signature Feature
Reality meets model — side by side
Compare the 360° site reality with the BIM design from the exact same viewpoint. Every deviation is instantly visible.


Reports
Progress reports in English & Arabic
Generate a professional bilingual progress report with one click. Print to PDF and share directly on WhatsApp — no formatting, no spreadsheets.
Bilingual layout
English and Arabic side by side — suitable for all stakeholders.
Print to PDF
One click exports a print-ready PDF from the browser — no extra software.
WhatsApp-ready
Sized and formatted to share as a WhatsApp document with no friction.
Construction Progress Report
Progress by Level
تقرير تقدم الإنشاءات
التقدم حسب المستوى
Pricing
Interested? Book a demo
Tell us about your project and we'll put together a package and pricing that fit.
Integrations & ERP
Connect with the systems you already use — or let us build them
ArqTwin plugs into your existing software stack, and we build custom construction ERP modules when you need them.
Don't have a system yet? We build a full construction ERP — BOQ, payment certificates, and procurement — tailored to your workflow.
Talk Integrations →Integrations & Connected Construction
ArqTwin connects with the industry-standard tools your teams already rely on.
See your site without leaving your office.
No travel. No delays. Just results.
Book a 20-minute demo and see ArqTwin on a real construction project.
Get BIM & construction news
The headline of each update by email & WhatsApp — read the full story on our Articles page. Monthly, no spam.